Sunday, September 16, 2007

Raised Patio: Closer to Done






I haven't posted any updates to the raised patio for awhile, so here are some more pictures. First we have some details as to how the deck slabs were setup. The slabs rest on the masonry wall on the outside edge and the cast-in-place beams. Each slab rests on some caulking - specifically NP-1. This compound hardens, but never looses its elasticity. This allows the slabs to float a little - to have some room to play. Most of the deck slabs were put in place Sept 8, but there are still 3 left to place as of this weekend. The pictures above show how most of the slabs were laid. Then there was the column "customizing" work that was done to make one fit near the stairs.

Between the 8th and today, more balusters were added. The longest runs (out from the wall) were finished, with a few missing at the front near the stairs. One pictures shows the railing waiting to be installed. This piece of pre cast is the largest (and heaviest) piece in the project. It is nearly 10 feet long and about 6"-8" wide. This will tie the balusters together and provide excellent stability. Similar, but smaller, pieces will complete the railing near the stairs, as well as become the railing beside the stairs themselves.

Finally, there is the start of the last holes to dig. This will be where the footing for the stairs will go. Still have a few more feet down to dig, but that will have to wait. I have some stitches and the doctor told me not do things like digging until they come out next week. Oh well - more time to post on the old blog page.

No comments: